Feedback Loops with FAIR Data Steward¶
Persona: FAIR Data Steward (FDS) Level: Intermediate Duration: 25 minutes
Outcome¶
Configure and optimize feedback loops involving FAIR Data Steward
Prerequisites¶
- FCC framework installed and configured
- Basic understanding of the Find phase
- Completed beginner tutorials for FAIR Data Steward
Steps¶
1. Feedback Loop Design¶
Complete this section to progress through the tutorial.
2. Configuration¶
Complete this section to progress through the tutorial.
3. Loop Optimization¶
Complete this section to progress through the tutorial.
4. Monitoring¶
Complete this section to progress through the tutorial.
Verification¶
After completing this tutorial, verify your results against FAIR Data Steward's quality gates and expected outputs.
Next Steps¶
Continue with the advanced tutorials for production-ready FAIR Data Steward usage.